DESCRIPTION
Rise in soil water level and exposure to water were major challenges for concrete works during the construction of Golden Tower, a twin Tower (i.e. Tower A & B). Hence, the need to waterproof balcony and toilet floor areas, swimming pools and Jacuzzis, and then, the roof slabs.
Waterproofing became a necessity in order to prevent water seepage through the concrete which could lead to corrosion of reinforcements and finishes where applicable, thereby having an adverse effect on the building