Hotel, Ikoyi

DESCRIPTION

Due  to  construction  works  and  the  need  to  take  care  of  rise  in  water level after backfilling (covering exposed areas that will be below grade), the need to waterproof structural steels,  external concrete walls, joints between  concrete  and  steels,  cold  joints  and  foundation  concrete  sur- face of Chelsea Hotel arose.