DESCRIPTION
Due to construction works and the need to take care of rise in water level after backfilling (covering exposed areas that will be below grade), the need to waterproof structural steels, external concrete walls, joints between concrete and steels, cold joints and foundation concrete sur- face of Chelsea Hotel arose.